EV provision across let commercial estates, business parks and multi-tenant buildings — future-proofing the asset, meeting building-reg duties and passing cost to tenants.
What landlord & commercial property involves
The Commercial Landlord grant closed in 2026, so commercial estates now fund via the WCS (where staff use the bays) or capex + 100% FYA; Approved Document S (Part S) drives new-build/major-renovation duties; tenant metering and billing via a back-office.
Sizing and cost
A typical landlord & commercial property project runs to Passive ducting + 2-10 active 7-22kW sockets per site, at an indicative £15,000-£120,000 with roughly a 4-year payback. The biggest cost variable is the electrical connection, not the chargers — which is why we lead with your supply and use load management to fit more sockets within it wherever possible. See the full cost breakdown and charger-type guide.
Compliance and connection
Approved Document S: new non-residential building with >10 spaces needs >=1 chargepoint + ducting to 1/5 of remaining spaces (and major renovations); MEES/EPC pressure; DNO spare-capacity check.
We handle the Distribution Network Operator application and, where a public or paid element applies, design to the relevant regulations from the outset. Read more on load management and the DNO connection.
Funding this project
The 100% First-Year Allowance lets you write the chargepoint cost off against tax; where a grant applies to your use case we handle the paperwork. See our grants and funding guide for the current, dated position and the schemes that closed in 2026.
EV charging for commercial landlords, estates and business parks
As a landlord you rarely drive the cars that use the bays — your tenants do. That single fact reshapes every decision here: you fund the infrastructure, but the electricity, the billing and the day-to-day usage belong to the occupiers. The winning move is to install landlord-owned hardware with per-tenant metering, so charging becomes a recoverable service charge or a metered amenity rather than a cost you absorb.
Compliance is what bites first. Building Regulations Part S now requires EV provision on new non-residential buildings and major renovations with more than 10 parking spaces — one chargepoint installed plus cable routes (passive ducting) to at least one in five of the remaining bays. If you are refurbishing an estate or adding a unit, this is not optional, and retrofitting ducting after the tarmac is down costs multiples of laying it during works. Specify passive infrastructure to every bay you reasonably can; it is the cheapest future-proofing you will ever buy.
On funding, be clear-eyed: the dedicated commercial landlord grant closed in 2026. What remains genuinely useful is the Workplace Charging Scheme — £500 per socket, covering 75% of cost up to 40 sockets, open until 31 March 2027 — but it only applies to bays for staff and fleet, so it fits owner-occupied or single-tenant units rather than pure investment estates. For multi-tenant lets, the realistic route is capex plus the 100% First-Year Allowance (also to 31 March 2027), which lets you write off the full installation against tax in year one. See our grants and funding breakdown for which bays qualify under which route.
Sizing an estate is about breadth over brute power. Tenant and visitor parking is served well by 7kW AC bays at roughly £800–£1,500 each — most cars cap at 7–11kW AC anyway, so 22kW units (£2,500–£4,500) are usually wasted spend unless a specific tenant runs dwell-limited vehicles. Rather than one or two rapid units, put in more 7kW bays across the site. Where a business park has a shared transformer, dynamic load management lets you add far more bays on the existing supply instead of triggering a five-figure DNO reinforcement; our load management guide shows how the same headroom stretches across dozens of sockets. Any three-phase or high-load design needs G99 approval before works — build that lead time into the programme.
The commercial case is asset value, not fuel savings. EV-ready bays are becoming a letting differentiator: tenants increasingly screen for them, and under MEES the direction of travel on minimum energy efficiency standards makes future-proofed, low-carbon estates easier to let and to value. A landlord-owned, metered network turns a compliance obligation into a recoverable revenue line and a stronger rent review position. Note that if you make charging public and paid, the Public Charge Point Regulations 2023 apply — contactless payment, transparent p/kWh pricing and 99% rapid reliability — so most landlords keep bays tenant-and-visitor only to stay outside that regime.
Typical payback on a well-metered estate lands in the mid-single-digit years once service-charge recovery and the First-Year Allowance are factored in — but it hinges on getting the metering architecture and supply headroom right from day one. Tell us your site's space count, supply and tenant mix and we will scope bays, ducting and load strategy to match: request a landlord estate quote.
Typical landlord & commercial property install
- Sockets & power
- Passive ducting + 2-10 active 7-22kW sockets per site
- Typical project value
- £15,000-£120,000
- Payback
- 4 years
Get a free landlord & commercial property quote
Responds within one working day
- 1. Free desk feasibility from your meter data and roof, no obligation.
- 2. Site survey and a fixed-price proposal, itemised in writing.
- 3. Install and aftercare by MCS-certified engineers.
- MCS Certified
- NICEIC
- RECC
- TrustMark